ECAddfromOperationTable.html
- Welcome To Exenta Shop Floor Control
- Exenta Shop Floor Control Web Application
- Menus
- Manage Menu
- Products
- Bill of Labor
EC Add from Operation Table
ED add on is set in the relevant colum in the bill of operations for a product:
Setting to configure whether the EC add on figure from the operation, or the master operation list is used:
Example Operation:
EC Add On will be the .5 instead of the .0380
Copyright © 2020 by Exenta. All rights reserved.
Toggle navigation