Android Tablet Overview
App Overview
- Total efficiency - calculated as the SMV over the total work time (On + Off). This will drop if you spend time in off-standard.
- Onstandard Efficiency which is the SMV over the on Standard work time. This will not drop if you spend time in off-standard. For example, 54 SMVs worked in 60 minutes = 90% efficiency. (54/60 * 100)
- Total SM – number of standard minutes worked in this session
- Total off standard time – time spent in off standard in this session
- On standard efficiency – percentage SMVs accrued divided by 60 (minutes/hour)
- Total counter – number of items processed in this session
- Total worktime – time spent working since production reset which can be configured in the schedules section
- Deducted SM – deductions based on quality control issues
- Operation SMV - the standard minute value (SMV) for this operation
- Operation PR - the piece rate for this operation
Spanish Version
German Version
Efficiency and star feedback on completed work
For every piece completed, in the operator gets a quick and visual feedback of efficiency for the last job. Stars are related to % efficiency which can be configured in the global settings
3 stars = 100% efficiency
2 stars = 80% efficiency
1 star = 30% efficiency
Copyright © 2020 by Exenta. All rights reserved.
Created with the Personal Edition of HelpNDoc: 5 Reasons Why a Help Authoring Tool is Better than Microsoft Word for Documentation